EIRA
Green Hydrogen Project Optimization
Turn scattered H2 development into one auditable flow. Optimize LCOH, compare electrolyzer tech (PEM/ALK), and deliver IC-ready outputs—faster approvals, better economics.
See PricingExcel Can't Iterate Fast Enough for Project Gates
Slow Iteration
Excel can't compare PEM vs ALK, grid vs hybrid power, and OEM options fast enough. You're stuck testing 3-5 configs manually.
Consultant Delays
Consultants take weeks to deliver one scenario. When assumptions change, you're back to square one.
No Audit Trail
Scattered spreadsheets and email chains. You can't prove how you got to FID. Lenders want transparency.
EIRA Optimizes LCOH Across Design Choices
Compare electrolyzer tech, model power sourcing, and deliver bankable outputs—all in one auditable workspace.
Electrolyzer Modeling (PEM/ALK)
Compare PEM vs alkaline tech across OEMs. Model degradation, efficiency curves, and CAPEX/OPEX trade-offs.
Power Sourcing Optimization
Model grid, hybrid (solar/wind), and off-grid power. Optimize sourcing mix to minimize LCOH.
OEM Comparison
Compare electrolyzer vendors side-by-side. See which OEM delivers the best economics for your project.
LCOH Optimization
Optimize across design variables to minimize levelized cost of hydrogen. Achieve 10-20% LCOH improvement.
Contract & Incentive Modeling
Model offtake agreements, subsidies, and tax credits. See how incentives impact project economics.
Auditable Change Logs
Every assumption, every change, tracked. Prove to lenders and ICs how you reached your decision.
Usage-Based Pricing
Flexible plans that scale with your project pipeline. Pay for what you use.
Essentials
- ✓Unlimited users
- ✓Unlimited reports
- ✓Full modeling suite
- ✓Electrolyzer database
All plans include continuous platform updates and investor-ready reporting.